New School Construction

Home / Projects / New School Construction

Construction of a new school | DIRECTLY to DONATION

schulneubau

 

Overview – All projects in 2020, projects 2021

 


 

Himalayan School Project | DIRECTLY to DONATION

 

Dolpo Tulku Rinpoche developed the vision of building a Himalayan school based on the need in his native region Dolpo. The students can attend up to class 6 or 8 there and then need to come to Kathmandu for further eduction. In many cases they cannot attend schools with subjects dealing with their culture and mother tongue tibetan. This often leads to an alienation in their young adulthood. Therefore Dolpo Tulku has bought a large piece of land near Kathmandu to build a school which combines the Nepali curriculum and Himalayan subjects. Up to 300 children are to be educated there eventually and graduate with a School Leaving Certificate (SLC) after the 10th grade.

The first steps in 2016 and early 2017 were to level a road up to the school and to the secure the land and prepare it for building. The first phase includes two buildings (indicated in yellow) which will function as hostels, classrooms, teachers’ living quarters, kitchen etc. After completion the first 80 to 100 children can be admitted. The costs for this phase is 850.000 Euro / 970.000 USD

 

Infosheet on the Himalayan School Project

 

 

Sankhu School 3d pic1

 

 

 

 

Masterplan of the school

 

REV MASTER PLAN march 17 w:o name

 

 

3D plans of school

 

sankhu-school-3d-pic1-small

 

sankhu-school-3d-pic3-small

 

Construction of the roads to the school

 

mmexport1460277474141  mmexport1460277485968

 

Estimated costs for the first phase: 850.000 € / 955,000 USD | DIRECTLY to DONATION